"Disassemble top and back of machine. match wires and pressure tubes."
STEAM WAND ASSEMBLY COMPLETE
Location Ref:
Exploded diagrams, Schematics and other documents
Installation
Kevin
NSW
"Follow this youtube video httpsyoutu.beay8qd6m_vd0"
Martin
VIC
"2 screws behind machine, 2 screw front bottom. pretty easy if hands on. took roughly 10-15 mins."
Jeff
QLD
"Remove top of machine via 4 screws, remove steam wand via 3 screws, unclip hoses and wires. install new steam wand part, reverse dismantle steps."
Dan
ACT
"Fiddly disassemble-reassemble. takes time and patience."
Gerard
WA
"Watched youtube video"
John
CORNWALL
"Once top and back off, drop front panel forward ( one screw each side on top) to access two push in connectors on pcb. i spliced the new earth wire to the old one as the old connectors were corroded on. pin for steam connection is tricky to put back in. i dropped mine down inside and couldnt find it so had to use stiff wire and twist tight. be careful not to forget the o ring seal for this pipe, it may still be inside the hole when you removed the old one."